Kalkbreite
Yes, the trams live downstairs.
City
Zürich
Year
2014
Homes
~97
Residents
~250
Architect
Müller Sigrist
Tenure
Cooperative
Site
Over a tram depot
Kalkbreite puts cooperative housing and commercial uses around and above a working Zürich tram depot. Opened in 2014, it accommodates about 250 residents. The cooperative describes a roughly 2,500 m² courtyard open to the public and about 1,500 m² of roof terraces for residents. [Project source]
The distinction matters: a publicly accessible court and a resident terrace have different jobs. They need different access arrangements, opening hours and care. The dramatic section is memorable, but the rules about who can use which space are part of the architecture too.
A roof can be somebody else’s ground.
Treat the raised court as a lesson in connection, not a free bonus parcel. Getting people up to it, keeping the depot working, isolating noise and vibration, and managing structure and drainage all have consequences. A complicated site can produce a wonderful place without being cheap or easy to repeat.
For a Berkeley version, start with a ground-level alternative. What is gained by stacking the uses, and does that gain justify elevators, loading, waterproofing and long-term repairs? A great section still needs a reserve fund.
Borrow the question, adapt the answer
- Label public, shared and private spaces explicitly. “Courtyard” does not settle access.
- Study transit infrastructure as a possible neighbor, with engineering and operating partners involved early.
- Test commercial rents and vacancy separately from housing affordability; lively storefronts are a goal, not guaranteed income.
Genossenschaft Kalkbreite · building and shared spaces. Reviewed October 2026. Approximate counts are identified; population changes over time.
Previous case
← La Borda, Barcelona
Next case
Spreefeld, Berlin →

